Turnkey Workshop Planning

Layout, electrics, dust extraction and flow plan

Turnkey Workshop Planning

For a new workshop or factory we plan machine layout, dust extraction, compressor and vacuum infrastructure.

Free for ordering customers

Layout determines efficiency as much as machine choice. We study your product flow, daily capacity target and available space, draw a workshop plan and notify you of electrical and infrastructure needs in advance.

What does the plan cover?

  • Machine layout drawing and material flow analysis
  • Sizing of dust extraction, filters and compressors
  • Electrical power and earthing requirements
  • Raw material storage area and forklift paths

The workshop plan is free for customers who order machines. For large factories needing a project, 3D layout visuals are prepared.

Scope of service

  • Layout and flow plan
  • Dust extraction and compressor sizing
  • Electrical infrastructure list
  • 3D layout visual

Turnkey Workshop Planning — get a quote

Fill in the form and we will get back to you as soon as possible.

Frequently asked questions

Which size should I choose for a CNC router?
Choose by the board size you use most. For 1,220 × 2,440 mm boards, the 1325 (1,300 × 2,500) suits; for 1,830 × 2,750 mm boards, the 1530 or 2231 models fit. We recommend a working area at least 50 mm larger than the board for edge margin.
Is an ATC (automatic tool changer) necessary?
If you work with a single tool it is not needed, but if you use several tools for cutting, milling and drilling, an ATC shortens process time by about 30% on average and reduces operator error. It is recommended for serial production.
Up to what thickness can plasma cut?
Clean cut is 25 mm with a 130 A source and 32 mm with 200 A; severance cuts reach 38 and 50 mm respectively. On thinner plate, speed and edge quality are much higher.
Which software does the machine work with?
With Kerfa Nest you can use DXF and DWG files directly. We also prepare post-processors for popular CAM software and support XML module input from furniture design programs.
What infrastructure is needed for installation?
A level concrete floor, 380 V three-phase power, earthing, 6-8 bar compressed air and, for dusty work, a dust extraction system. You can download our Infrastructure Guide or use our free workshop planning service.
WhatsApp +90 352 502 18 00 info@kerfamakina.com.tr