
At our Kayseri OSB plant, every stage from frame welding to final quality testing takes place under one roof.
Production flow
- Laser cutting and welding: Frame parts are cut on our own lasers and joined in a robotic welding cell.
- Stress relief: Welded structures are annealed at 600 °C, then machined on a CNC gantry mill.
- Paint shop: Electrostatic powder coating, a 200 °C oven and 15-year corrosion expectancy.
- Assembly: Rail, screw, spindle and electrical assembly; a measurement report for each machine.
- Testing: A 72-hour load run test and sample-cut acceptance.
Capacity
With a capacity of 45 machines per month, 4,200 m² of warehouse and 2,800 spare-part items in stock, average order-to-shipment time is 21 business days. Visitors can tour the plant by appointment and see the production stages of the machines.