
12-48 month financing with partner banks and leasing companies; file support for SME and investment incentives.
By quotation
We offer flexible payment plans so a machine investment does not strain your cash flow. Down payment ratio, term and rate options are structured to your needs.
Options
- 30% down, the rest in 12-24 month post-dated cheques or notes
- 36-48 month financial leasing with partner leasing companies
- Trade-in of an old machine to complete the down payment
- Technical documentation for investment-incentive and SME-support applications
With our payback calculator you can see how long the investment takes to repay itself and use the results as supporting material in your bank application.
Scope of service
- 12-48 month financing
- Partner leasing companies
- Down payment via trade-in
- Incentive file support
Financing and Leasing — get a quote
Fill in the form and we will get back to you as soon as possible.
Frequently asked questions
Which size should I choose for a CNC router?
Choose by the board size you use most. For 1,220 × 2,440 mm boards, the 1325 (1,300 × 2,500) suits; for 1,830 × 2,750 mm boards, the 1530 or 2231 models fit. We recommend a working area at least 50 mm larger than the board for edge margin.
Is an ATC (automatic tool changer) necessary?
If you work with a single tool it is not needed, but if you use several tools for cutting, milling and drilling, an ATC shortens process time by about 30% on average and reduces operator error. It is recommended for serial production.
Up to what thickness can plasma cut?
Clean cut is 25 mm with a 130 A source and 32 mm with 200 A; severance cuts reach 38 and 50 mm respectively. On thinner plate, speed and edge quality are much higher.
Which software does the machine work with?
With Kerfa Nest you can use DXF and DWG files directly. We also prepare post-processors for popular CAM software and support XML module input from furniture design programs.
What infrastructure is needed for installation?
A level concrete floor, 380 V three-phase power, earthing, 6-8 bar compressed air and, for dusty work, a dust extraction system. You can download our Infrastructure Guide or use our free workshop planning service.