Completed
Furniture and Kitchen
Konya OIZ

A steel structure maker in Konya brought bevel and marking work in-house with two KP-2060s.
Doruk Steel Structures outsourced plate cuts over 20 mm and waited weeks. With two KP-2060 gantry plasmas it brought cutting entirely in-house.
Plate waste fell from 9% to 6%, and average job lead time from 12 days to 4.
Completed
Completed
Completed
Share your drawing and our engineers will cut a sample and recommend the right machine.